Unpacking And Installation; Prepare; Installation - Selecta RE-650 Manual Instrucciones

Reactor para planta piloto
Tabla de contenido
Idiomas disponibles

Idiomas disponibles

2. Unpacking and Installation 
2.1 Prepare
 
1) After  unpacking  the  case,  please  read  the  operation  manual  carefully,  and  check  whether  the  components  are 
enough compare with the packing list.  
2) Take out the frame, put it on the floor then lock the casters.  
      Note: The vessel and frame are assembled completely of reactors less than 20L.
3) Please clean the glass parts to maintain its cleanliness to meet the test requirements before installation.  
Note: Glass device is fragile, please be careful when unpacking.
2.2
Installation 
 
2.2.1   RE‐650 vessel installation 
1) The vessel (9) fits from the bottom of the middle tray (8).  
2) The sealing ring (71) is fitted from the flange mouth of the vessel(9).  
3)   Put the sealing ring (71) on the middle tray(8)to make their circle fitted.  
 
42
 
 
Tabla de contenido
loading

Este manual también es adecuado para:

1001840

Tabla de contenido