Complete Installation - Kohler K-7202 Guia De Instalacion

Ocultar thumbs Ver también para K-7202:
Tabla de contenido
Idiomas disponibles

Idiomas disponibles

6. Complete Installation

- Install P-Trap per manufacturers instructions.
- Ensure that all connections are tight.
- Turn on the main water supply and check for leaks. Repair as needed.
- Close the drain. Fill the bath with water and check for leaks. Ensure
that the overflow connections do not leak.
- Open and close the control knob to check for proper operation of the
drain plug.
C
1013265-2-
6
Kohler Co.
Tabla de contenido
loading

Tabla de contenido