Intended Use; Scope Of Delivery; Electrical Voltage; Potentially Explosive Atmosphere - Bühler technologies TC-Double Guía Rápida

Refrigerador termoeléctrico de gases de muestreo
Ocultar thumbs Ver también para TC-Double:
Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 28
TC-Double (+)
1 Introduction
This quick guide will assist you in starting up the unit. Follow
the safety notices or injury to health or property damage may
occur. Carefully read the original operating instructions in-
cluding information on maintenance and troubleshooting
prior to startup. These are located on the included CD and on-
line at
www.buehler-technologies.com
Please direct any questions to:
Bühler Technologies GmbH
Harkortstraße 29
40880 Ratingen
Germany
Tel.: +49 (0) 21 02 / 49 89-0
Fax: +49 (0) 21 02 / 49 89-20
These operating instructions are a part of the equipment. The
manufacturer reserves the right to change performance-, spe-
cification- or technical data without prior notice. Please keep
these instructions for future reference.

1.1 Intended use

This unit is intended for industrial use in gas analysis systems.
It's an essential component for conditioning the sample gas to
protect the analysis instrument from residual moisture in the
sample gas.
Please note the specifications in the data sheet on the specific
intended use, existing material combinations, as well as pres-
sure and temperature limits.

1.2 Scope of delivery

• Cooler
• Product documentation
• Connection-/mounting accessories (optional)
2 Safety instructions
The equipment must be installed by a professional familiar
with the safety requirements and risks.
Be sure to observe the safety regulations and generally applic-
able rules of technology relevant for the installation site. Pre-
vent malfunctions and avoid personal injuries and property
damage.
The operator of the system must ensure:
• Safety notices and operating instructions are available
and observed,
• The respective national accident prevention regulations
are observed,
• The permissible data and operational conditions are
maintained,
• Safety guards are used and mandatory maintenance is
performed,
• Legal regulations are observed during disposal,
• compliance with national installation regulations.
BX440021 ◦ 09/2021
DANGER

Electrical voltage

Electrocution hazard.
a) Disconnect the device from power supply.
b) Make sure that the equipment cannot be reconnected to
mains unintentionally.
c) The device must be opened by trained staff only.
d) Regard correct mains voltage.
DANGER
Toxic, corrosive gases
The measuring gas led through the equipment can be hazard-
ous when breathing or touching it.
a) Check tightness of the measuring system before putting
it into operation.
b) Take care that harmful gases are exhausted to a save
place.
c) Before maintenance turn off the gas supply and make
sure that it cannot be turned on unintentionally.
d) Protect yourself during maintenance against toxic / cor-
rosive gases. Use suitable protective equipment.
DANGER

Potentially explosive atmosphere

Explosion hazard if used in hazardous areas.
The device is not suitable for operation in hazardous areas
with potentially explosive atmospheres.
Do not expose the device to combustible or explosive gas mix-
tures.
3 Transport and storage
Only transport the product inside the original packaging or a
suitable alternative.
The equipment must be protected from moisture and heat
when not in use. It must be stored in a covered, dry and dust-
free room at a temperature of -20 °C to 60 °C (-4 °F to 140 °F).

4 Installation and connection

4.1 Installation site requirements

The unit is only intended for wall-mounted use in enclosed
areas. Adequate protection from the weather must be
provided when used outdoors.
Install the unit leaving enough room below the cooler to dis-
charge the condensate. Leave room above for the gas supply.
Be sure to maintain the approved ambient temperature. Do
not obstruct the convection of the cooler. The vents must have
enough room to the next obstacle. The distance must espe-
cially be a minimum of 10 cm on the air outlet side.
Ensure adequate ventilation when installing in enclosed
housings, e.g. analyser cabinets. If the convection is inad-
equate, we recommend aerating the cabinet or installing a
fan to lower the inside temperature.
Bühler Technologies GmbH
11
Tabla de contenido
loading

Este manual también es adecuado para:

Tc-double +

Tabla de contenido