Outdoor Construction - Mitsubishi Electric VL-100U5-E Manual De Instalación

Ocultar thumbs Ver también para VL-100U5-E:
Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 38

Outdoor construction

1. Fill the wall hole.
Fill in any gaps between the air supply/exhaust
pipes and the wall holes with off-the-shelf
caulking.
Caulking
Air supply/exhaust pipes
Note
- Any spaces left unfilled will allow rainwater
to enter.
2. Installing the weather covers
1) Insert the weather cover mounting plates into
the air supply/exhaust pipes.
2) Tighten the flange nuts. (Be sure that
the UPPER marks on the weather cover
mounting plates are at the top.)
3) Attach the weather covers with the mounting
screws.
Air supply/exhaust
pipe
Flange nut
"Cap" area
Note
- The weather covers are blocked in one area
to ensure that the air supply and exhaust do
not mix. Mount the blocked parts on both
the air supply and exhaust sides so that
they are on the left, as shown above.
- If the weather covers shift, check that the
air supply/exhaust pipes are cut to the
correct dimensions. (Pushing the pipes too
hard into the wall may cause the pipes to
shift or prevent the shutter from operating
properly.)
- Weather cover mounting plate have two
holes (φ5 mm) in them. Use these holes to
secure the flanges to the wall.
Weather cover
mounting plate
Weather
cover
Screw for securing
weather cover
3. Preventing infiltration of rainwater
Caulk around the entire perimeter of the weather
covers.
Caulking
Eng-8
Weather covers

Hide quick links:

Tabla de contenido
loading

Este manual también es adecuado para:

Vl-100eu5-e

Tabla de contenido