Sartorius YAS02CI Instrucciones De Instalación página 5

Idiomas disponibles
  • ES

Idiomas disponibles

Position the 24V industry power grid module
inside the indicator as shown in the illustration.
Replace the 2 fastening screws to install
the module.
Connect the cable from the main PCB to
the socket on the 24V industrial power grid
module (1).
Connect the two leads from the 24V cable to the
terminal block on the 24V industrial power grid
module (2). The input voltage is rectified, so that
the module is protected from reversing the poles.
$ If the 24V cable has a ground wire (earth),
connect it to the 24V industrial power grid
module (3).
Position the front panel on the indicator and
tighten the 4 screws to 1 Nm.
Check the voltage rating and the plug design.
5
loading