Kohler K-7303 Guia De Instalacion página 8

Tabla de contenido
Idiomas disponibles

Idiomas disponibles

Aerator
5. Installation Checkout
Connect the tailpiece and P-trap (as needed).
Install strainer bodies (as needed).
Ensure that all connections are tight.
Remove the aerator by turning it counterclockwise.
Open the drain.
Turn on the main water supply and check for leaks. Repair as
needed.
Open both hot and cold valves and run water through the spout
for about a minute to remove debris. Check for leaks. Turn valves
off.
Remove any debris from the aerator and reinstall.
117121-2-AB
8
Kohler Co.
Tabla de contenido
loading

Este manual también es adecuado para:

K-7313K7303-k-cpK-7303-kc-cpK-7303-ke-cp

Tabla de contenido