Appendix B: Maintenance Checklist - Nederman FX2 Original Manual De Instrucciones

Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 39
EN
FX
Original/Chem
2

Appendix B: Maintenance checklist

Copy the maintenance checklist, fill it in and save it as a service record.
For values, note the value in the result column, otherwise a tick will suffice if the item has
been performed or considered.
WARNING!
Always read section 3. Safety before installation, use, service, or troubleshooting of this
product.
NOTE! If a value is outside its accepted level, or a result is incorrect or missing, fix the
problem before initial start-up and normal operation.
Unit No.
Items to inspect
Dismantle the arm. Clean the whole
arm internally and externally.
Adjust the links.
Check the mounting of the arm on
wall, bench or ceiling.
Check the airflow. If it is reduced, the
ventilation system must be inspected.
20
Risk of personal injury.
Date:
Operating hours:
Performed by:
Interval
Accepted level
Annually
Annually
Annually
Annually
OK
Repaired
Replaced
Part number
Tabla de contenido
loading

Este manual también es adecuado para:

Fx2 chem

Tabla de contenido