4. Installation
EPO Port Connection
2
This optional feature is only for those applications that require connection to a facility's
Emergency Power Off (EPO) circuit. When the UPS is connected to this circuit, it enables
emergency shutdown of its inverter and inhibits transfer to internal bypass. A cable is required
to connect the EPO port of the UPS (see
according to the circuit diagram (see
Notes:
1. The cable should not have a resistance greater than 5 ohms.
2. If a non-latching EPO switch is used, the EPO must be held for a minimum of 1 second. This does not
apply to a latching EPO switch.
2a
UPS Unit State when asserting EPO with AC line present:
LEDs
Output
OFF
OFF
To restart the UPS unit after asserting EPO with AC line present:
1. Verify the EPO assertion has been removed or cleared.
2. Press the ON button
3. Now the UPS will start back up in Bypass mode.
UPS Unit State when asserting EPO without AC line power:
LEDs
Output
OFF
OFF
To restart the UPS unit after asserting EPO without AC line power:
1. Verify the EPO assertion has been removed or cleared.
2. Reapply AC line power to the UPS unit. Now the UPS will start back up in Standby mode.
18-09-247-933652.indb 8
2a
) to a normally closed or normally open switch
2b
). The cable and switch must be supplied by the user.
2b
Fans
Serial
ON (if in
ON
frequency
conversion
mode)
Fans
Serial
OFF
OFF
8
4-5
SNMP
USB
ON
ON
SNMP
USB
OFF
OFF
2/13/2019 3:27:29 PM
Tabla de contenido

Solución de problemas

loading

Este manual también es adecuado para:

Smartonline ag-0264

Tabla de contenido