Gessi Inciso 58199 Manual Del Usuario página 18

Programa mezcladores baño
Ocultar thumbs Ver también para Inciso 58199:
Tabla de contenido
INSTALLATION - INSTALLATION - INSTALACIÓN
Plasterboard ceiling - Plafond en Placoplâtre - Techo de cartón-yeso
Installation (Plasterboard ceiling)
Remove the spout from the pipe without damaging it.
Fig. 9 -Piercewitha1/2"D.[12mm]bitinthepreviouslyindicatedpoints.
Fig. 10 - Introduce plugs as indicated.
Fig. 11 - Screw the mouth to the supply pipe approaching as much as possible to the
suspended ceiling with the fastening plate and make holes coincide with plugs.
Fig. 12 - F astenfirmlythemouthtotheceilingwiththescrewssuppliedsothattheanchorage
is effective.
Fig. 13 -Letthefinishrosetteslideuptotheceiling.
Installation (Plafond en Placoplâtre)
Retirer la bouche du tube sans l'endommager.
Fig. 9 -Perceravecunepointe1/2"D.[12mm]auxpointsprécédemmentrepérés.
Fig. 10 - Introduire les chevilles comme indiqué.
Fig. 11 - Visser la bouche sur le tube d'alimentation en rapprochant le plus possible la
plaquettedefixationdufauxplafondetfairecoïncidersestrousavecleschevilles.
Fig. 12 - F ixeravecforcelabouchesurleplafondaveclesvisfourniesafinquel'ancrage
fonctionne.
Fig. 13 -Fairecoulisserlarosacedefinitionjusqu'auplafond.
Installación (Techo de cartón-yeso)
Quitenelcañodeltubosindañarlo.
Fig. 9 -Horadenconunabroca1/2"D.[12mm]lospuntosanteriormentemarcados.
Fig. 10 - Introduzcan los tacos como indicados.
Fig. 11 - A tornillenelcañoaltubodealimentaciónacercándoselomásposiblealfalsotecho
conelplatodefijaciónyhagancoincidirloshuecosconlostacos.
Fig. 12 - F ijenconfuerzalabocaaltechoutilizandolostornillosincluidosenelsuministro
paraqueelanclajetengaéxito.
Fig. 13 -Hagandeslizarelfloróndeacabadohastaeltecho.
18
Tabla de contenido
loading

Este manual también es adecuado para:

Inciso 58299

Tabla de contenido