Delta 13 Serie Instrucciones Para La Instalación página 3

Acabado de la válvula universal
Ocultar thumbs Ver también para 13 Serie:
Tabla de contenido
Idiomas disponibles

Idiomas disponibles

Cartridge Installation
1
A.
Turn off water supplies. Remove
cover (1), bonnet nut (2) and test cap (3)
from the body.
C.
Back to back Installation
Normal Installation (changes not required)
Reverse
Installation
Cold
For back to back or reverse installations
(hot on right and cold on left) insert the
cartridge with the "hot side" on the right.
If you are not making a reverse or back
to back installation skip this step and
continue with step 1D.
Hot
13 / 14 Series Installation
B.
Rotate the cartridge (1) so the words
"hot side" (2) appear on the left. Insert
cartridge into valve body as shown. Make
sure the cartridge tubes and o-rings (3) are
properly seated in holes at the base of the
body. Ensure the keys on the body are fully
engaged with the slots in the body (4).
D.
Slide bonnet nut (1) over the cartridge
and thread onto the body. Hand tighten
securely.
Tabla de contenido
loading

Este manual también es adecuado para:

14 serie17 serie

Tabla de contenido