21
9. Structure (sections/ guy-wires)
6 x d
(
)
*
EN
The cable clips must be retightened once the cable
has undergone the first traction.
The body of the cable clamp must be fixed over
the active part of the cable, as shown in the diagram.
(
*
)
Tower assembling details and guy wire tension guide