SMA Sunny Tripower 15000TL Instrucciones Para La Sustitución página 20

Ocultar thumbs Ver también para Sunny Tripower 15000TL:
Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 114
5 Disconnecting the Inverter from Voltage Sources
15. Use an appropriate measuring device to ensure that
no voltage is present at the AC terminal block
between L1 and N, L2 and N, and L3 and N.
Insert the test probe of the multimeter into the round
opening in the terminal.
16. Use an appropriate measuring device to ensure that no voltage is present at the AC terminal
block between L1 and PE, L2 and PE, and L3 and PE. Insert the test probe into each round
opening of the terminal.
17. Ensure that no voltage is present between any terminal of the multifunction relay and PE of the
AC terminal block.
18. Disconnect the communication assembly from the
inverter. To do so, release and remove the ribbon
cable from the communication assembly.
19.
Danger to life due to high voltages in the inverter
The capacitors in the inverter take 20 minutes to discharge.
• Wait 20 minutes before opening the upper enclosure lid.
• Do not open the DC protective cover.
20. In the terminal contact of the DC switching unit,
discharge black to red and blue to white. In
addition, all points must be discharged to grounding
conductor.
20
STPTLEE-STPTL-10-BPDCLS-RM-xx-10
DANGER
SMA Solar Technology AG
Replacement Manual
Tabla de contenido
loading

Tabla de contenido