Installing the switch in an equipment rack
Required tool: Phillips screwdriver for attaching brackets to the switch
Rack requirements:
•
A space of 2.8 inches is required for each switch in an EIA or IEC standard 19-inch
(48.2-centimeter) equipment rack.
•
The rack must be bolted to the floor and braced, if necessary.
•
The rack must be grounded to the same grounding electrode used by the power service in the
area. The ground path must be permanent and must not exceed 1 ohm of resistance from the
rack to the grounding electrode.
Figure 2
provides instructions on installing the switch in a rack.
Figure 2 Installing switch in a rack
Up
Link/
Spee
d
49
Act
Down
50
Base
1
Statu
s
3
PWR
5
Reset
Cons
ole
7
9
11 11
Link/
PoE
Act
13
PoE
15
2
17
4
19
6
21
8
23
10 10
Link/
Act
12 12
PoE
14 14
16 16
18 18
20
20
22
22
24
24
1
Attach a bracket to each side of the switch.
322581-A
25
27
29
31
33
35
Link/
Act
37
39
26
41
28
43
30
BES
220 -48
45
32
T-P WR
47
34
36
38
40
42
44
46
48
10755FA
Up
Spee
Link/
d
49
Act
Down
50
Base
1
Statu
s
3
PWR
5
Reset
Cons
ole
7
9
11 11
PoE
Link/
Act
13
PoE
15
2
17
4
19
6
21
8
23
10 10
12 12
PoE
14 14
16 16
18 18
20
20
22
22
24
24
2 Slide the switch into the rack. Insert and
tighten the rack-mount screws.
Link/
Act
25
27
29
31
33
35
Link/
Act
37
39
26
41
28
43
30
BES
220 -48
45
T-P WR
32
47
34
36
38
40
42
44
46
48
10756FA