Installing The Switch In An Equipment Rack - Nortel 100 Serie Manual Del Usuario

Tabla de contenido
8

Installing the switch in an equipment rack

Required tool: Phillips screwdriver for attaching brackets to the switch
Rack requirements:
A space of 2.8 inches is required for each switch in an EIA or IEC standard 19-inch
(48.2-centimeter) equipment rack.
The rack must be bolted to the floor and braced, if necessary.
The rack must be grounded to the same grounding electrode used by the power service in the
area. The ground path must be permanent and must not exceed 1 ohm of resistance from the
rack to the grounding electrode.
Figure 2
provides instructions on installing the switch in a rack.
Figure 2 Installing switch in a rack
Up
Link/
Spee
d
49
Act
Down
50
Base
1
Statu
s
3
PWR
5
Reset
Cons
ole
7
9
11 11
Link/
PoE
Act
13
PoE
15
2
17
4
19
6
21
8
23
10 10
Link/
Act
12 12
PoE
14 14
16 16
18 18
20
20
22
22
24
24
1
Attach a bracket to each side of the switch.
322581-A
25
27
29
31
33
35
Link/
Act
37
39
26
41
28
43
30
BES
220 -48
45
32
T-P WR
47
34
36
38
40
42
44
46
48
10755FA
Up
Spee
Link/
d
49
Act
Down
50
Base
1
Statu
s
3
PWR
5
Reset
Cons
ole
7
9
11 11
PoE
Link/
Act
13
PoE
15
2
17
4
19
6
21
8
23
10 10
12 12
PoE
14 14
16 16
18 18
20
20
22
22
24
24
2 Slide the switch into the rack. Insert and
tighten the rack-mount screws.
Link/
Act
25
27
29
31
33
35
Link/
Act
37
39
26
41
28
43
30
BES
220 -48
45
T-P WR
32
47
34
36
38
40
42
44
46
48
10756FA
Tabla de contenido
loading

Este manual también es adecuado para:

200 serie

Tabla de contenido