SETTING MOTOR SPEED
According to standard EN 12445, every automation is required to pass the impact tests, which must be carried out using
a specific gauge.
Perform the impact tests and adjust the speed of movement by means of the trimmer (22 in Fig. 15).
If this does not suffice to bring the values within the limits published in the charts in the standards, we recommend fitting
a soft rubber profile on the top of the gate to deaden the impact.
If, after reducing the speed and fitting the rubber profile, the gate still does not comply with the standard, alternative
devices such a sensitive edge must be fitted on the gate's mobile edge.
COUPLING TYPE RECEIVER model OC (optional)
The receivers are "self-learn" type and can memorise several codes on the same channel.
The functions of the two radio channels are:
Channel 1 Step/step
Channel 2 N.C.
To memorise the transmitters proceed as follows:
- Insert the receiver in the connector (7 in fig. 15)
- Power up the control unit and wait for the receiver LEDs to turn off.
- On the receiver, briefly press the pushbutton of the channel to be memorised (P1 step/step) and the corresponding
LED starts to flash.
If the LED emits double flashes, wait briefly and repeat the operation (the pushbutton must only be pressed once).
-Transmitter with remote control to be programmed.
- If the LED on the receiver emits a longer flash, this means that memorisation is successful.
- If the code is already present in the memory, the receiver LEDs all flash simultaneously.
The code memory can be reset if required by pressing and holding P1 on the receiver for approx. 15 seconds until
all the LEDs light up.
The aerial must be connected to terminals 18 (sheath) and 19 (control unit), see Fig. 16.
For further information and specifications, see the manual supplied with the receiver.
FINAL TESTING
A final test should always be made after completing all programming procedures.
- Check correct operation of the protection devices (anti-crushing system, stop button, photocells, sensitive edges,
etc.)
- Check correct operation of the signalling devices (flashing lights, gate open indicator, etc.)
- Check correct operation of the control devices (S/S pushbutton, remote controls, etc.)