4
Scope of supply
1x tank pad, right
1x tank pad, left
Preparatory work
- Take off the seat (see the Owner's Manual).
- Remove left side fairing (see owner's manual).
- Remove the right side cover (see the Owner's Manual).
Assembly
- Drill mounting holes
with a diameter of 4.5 mm (pre-drill to 1 -
2 mm) using the relevant drill.
- Pull protective fi lm off the tank pads (included).
- Mount left tank pad
on left side fairing.
Pins rest in the holes.
NOTE
The Husqvarna logo points forwards.
- Mount right tank pad
on right side fairing.
Pins rest in the holes.
NOTE
The Husqvarna logo points forwards.
Final steps
- Install left side fairing (see owner's manual).
- Install right side fairing (see owner's manual).
- Mount seat (see owner's manual).