Mounting - Tripp-Lite SmartOnline Single-Phase 5kVA El Manual Del Propietario

Ocultar thumbs Ver también para SmartOnline Single-Phase 5kVA:
Idiomas disponibles

Idiomas disponibles

Mounting

Mount your equipment in either a 4-post or 2-post rack or rack enclosure. The user must determine the fitness of hardware and
procedures before mounting. If hardware and procedures are not suitable for your application, contact the manufacturer of your
rack or rack enclosure. The procedures described in this manual are for common rack and rack enclosure types and may not be
appropriate for all applications.
4-Post Mounting
The included plastic pegs
1
while you install the permanent mounting hardware. Insert a peg near the center of
B
the front and rear bracket of each shelf as shown. (Each front bracket has 6 holes
and each rear bracket has 3 holes.) The pegs will snap into place.
After installing the pegs, expand each shelf to match the depth of your rack rails. The
pegs will fit through the square holes in the rack rails to support the shelves. Refer to
the rack unit labels to confirm that the shelves are level in all directions. Note: The
support ledge of each shelf must face inward.
Secure the shelves
2
and cup washers
as shown.
C
• For 4U equipment mounting, place 6 screws total at the front and 4 screws total
at the back.
Tighten all screws before proceeding.
Warning: Do not attempt to install your equipment until you have inserted and
tightened the required screws. The plastic pegs will not support the weight of
your equipment.
Attach mounting ears
3
the screws provided
F
Note: It is recommended that you remove the internal batteries of the UPS prior to
installation. This will remove excess weight and will allow safer handling of equipment.
See Internal Battery Replacement section for battery removal instructions.
Using an assistant, lift your equipment and slide it onto the mounting shelves.
4
Attach your equipment to the rack by passing the screws, nuts and washers (user-
provided)
through its mounting ears and into the rack rails. Be sure to use separate
G
rack rails for each individual component.
12kVA UPS Configuration—SU12KRT4UHW Only (Using 2 6kVA Power Modules)
See manual included with parallel PDU for SU12KRT4UHW Mounting.
2-Post Mounting (Optional)
To mount your 5kVA or 6kVA UPS in a 2-post rack, you must purchase a Tripp Lite 2-Post Rackmount Installation Kit (model:
2POSTRMKITHD, sold separately) for each power module and battery pack installed. See the Installation Kit's owner's manual for
complete mounting instructions.
Note: 2-post mounting is not recommended for 12kVA UPS systems.
201102161 933070.indb 3
will temporarily support the empty rackmount shelves
A
to the mounting rails permanently using the included screws
B
to the front mounting holes of your equipment
D
. The ears should face forward.
1
2
using
E
3
G
4
3
A
B
B
A
B
C
B
C
E
D
SW
SW
14
14
3/29/2011 4:33:44 PM
A
F
loading

Este manual también es adecuado para:

Smartonline single-phase 6kva