Verifying The Installation - HP PB Guia De Instalacion

Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

international.book : chap4 15 Mon Dec 19 17:12:35 1994
4

Verifying the installation

1 Connect the power and boot the system.
The HP-PB PSI card immediately conducts a power-on, self-test to verify that the
hardware is working properly. The result of this test is indicated by the yellow status
(see Figure 4) located on the bulkhead of the card.
LED
Figure 4 status LED
Yellow status LED
PSI
Self-test passed
The status
will light while the test is in progress (5 seconds) and then go out.
LED
This means the hardware is functional, and you can now turn to the link product
software installation manual to install the software on this node.
Self-test failed
If the status
remains lit (for more than 5 seconds) the HP-PB
card has failed
LED
PSI
the self-test and must be replaced. Contact your HP support representative to report
the failure.
15
Tabla de contenido
loading

Tabla de contenido