Infiniton CMPTRAL-SS90 Manual Del Usuario página 15

Tabla de contenido
Idiomas disponibles

Idiomas disponibles

INSTALLATION
WALL DRILLING AND BRACKET FIXING
A
(2)
B
C
(OPTIONAL)
250
C
As a first step, proceed with the following drawings:
 A vertical line up to the ceiling or up to the upper limit, at the center of the area in which the
hood is to be fitted.
 A horizontal line A at 1320 – 1700 mm above the cooker top.
 A horizontal line B at a minimum 926 mm above the cooker top.
 A horizontal line C at a minimum 730 (910 optional) mm above the cooker top.
Mark Points:
 Mark a point (1) on the horizontal line A, 60 mm to the right of the vertical reference line.
 Repeat this operation on the other side, checking that the two marks are leveled.
 Mark a point (2) on the horizontal line B, 80 mm to the right of the vertical reference line.
 Repeat this operation on the other side and on the vertical reference line, checking that the
three marks are leveled.
60
(1)
60
80
80
250
(3)
130
130
12
EN-5
21
10
20
10
Optional
10
11
11
11
Tabla de contenido

Solución de problemas

loading

Tabla de contenido