H
Unit
A(mm)
B1(mm)
4~10kW
≥3000
≥2000
2) In case of installing multiple units in lateral connection per row.
H
A(mm)
B1(mm)
Unit
4~10kW
≥3000
≥2000
7 INSTALL THE CONNECTING PIPE
Check whether the differance in height between the indoor unit and
outdoor unit, the length of refrigerant pipe, and the number of the
bends meet the following requirements:
7.1 Refrigerant piping
4~10kW
A
C
B1
B2(mm)
C(mm)
≥150
≥600
B1
B2(mm)
C(mm)
≥300
≥600
Fig.7-1
11
<1/2 H
B2
Fig: 6-7
≥500mm
≥500mm
A
C
Fig: 6-8
gas
liqulid
1
2
<1/2 H
B2