Kohler K-19480 Guia De Instalacion página 5

Ocultar thumbs Ver también para K-19480:
Tabla de contenido
Idiomas disponibles

Idiomas disponibles

Stopper
Rod
Body
Apply
thread
sealant.
Tailpiece
3. Complete the Drain Installation
Press the seal into the seal hole on the body.
Insert the stopper into the flange.
For regular installations, insert the short end of the rod into the
body seal hole and under the stopper rod. For vandal-resistant
installations, fit the rod through the hole in the stopper rod.
Hand tighten the rod nut.
Remove and adjust the stopper as needed so it lifts about 3/8" (1
cm) when opened. To adjust, rotate the threaded stopper rod in or
out as needed. Retighten the stopper nut.
Apply thread sealant tape to the tailpiece threads, then thread the
tailpiece to the body. Tighten the tailpiece securely.
Slide one end of the clip onto the rod. Slide the link onto the lift
rod with the thumbscrew facing the back of the fixture.
Squeeze the other end of the clip, aligning the hole with the rod.
Move the link to the proper position by squeezing the clip and
sliding it along the rod.
Insert the lift rod into the hole in the body and then into the hole
in the link.
Tighten the thumbscrew onto the link so the lift rod knob extends
1/2" (1.3 cm) above the lift rod hole.
Kohler Co.
Stopper
Stopper Nut
Lift
Flange
Rod
Seal
Thumb
Screw
Rod
Rod Nut
Clip
Link
5
1050798-2-A
Tabla de contenido
loading

Tabla de contenido