2.10
E
2.11
N
G
L
I
S
H
2.12
34
3 - PROGRAM LEVEL #2
REGENERATION DAY OVERRIDE (A)
In timeclock regeneration mode, a value must be set.
Press the button
.This parameter is identified by the letter "A". This option is used to set the
regeneration day override option setting. This override setting determines the maximum amount
of time (in days) the softener can be in service without a regeneration, regardless of the volume
of water used or the lack of a sensor signal. The regeneration begins at the set regeneration
time.
Ex.: - Override every 7 days
- Option cancelled
VOLUME OVERRIDE (
Not viewed in timeclock regeneration mode.
Press the button
. This display is identified by the letter "b". The volume override option is used
to set the maximum amount of water that can be used before a regeneration cycle is called for.
This option is typically used to bypass standard reserve or capacity calculations made by the
electronics. When this feature is used with meter delayed regeneration systems, it will be up to
the installer to determine a reserve capacity and subtract it from the calculated full capacity. The
unit of measure depends on the display format chosen
Ex.: - Override every 2.6 m
- Option cancelled
DISPLAY FORMAT (U)
Note: If this parameter is changed, the programming comes immediately back to the level 1 and directly
followed by the level 2.
Press the button
. This display is identified by the letter "U". One of five following display
formats can be used. The current format used is the cubic meter (U4): the volume is in cubic
meter (m
3
), the flow rate in litre per minute (l/min), 24 hours timekeeping format, water hardness
in French degrees or °tH degrees and the sys-tem capacity in °tH degrees cubic meter (°tH x m
The format used for small volume is the litre (U2): the volume is in litre (l), the flow rate in litre
per minute (l/min), 24 hours timekeeping format, water hardness in French degrees or °tH
degrees and the system capacity in °tH degrees cubic meter (°tH x m
Ex.: - US format (not used)
- Litre format
- Standard metric (not used)
- Cubic meter format
- Japanese metric format (not used)
Note: for further information, please contact our customer service.
(1)
The unit of measure depends on the display format chosen.
All examples above are based on the cubic meter format (see point 2.12).
b
)
3(1)
(1)
.
3
).
3200 ET & RM
[A - - - - - 7]
[A - - - OFF]
[b - - 2600]
[b - - - OFF]
).
3
[U - - - - - 1]
[U - - - - - 2]
[U - - - - - 3]
[U - - - - - 4]
[U - - - - - 5]