Kohler STERLING SP2270A Serie Guia De Instalacion página 8

Tabla de contenido
Idiomas disponibles

Idiomas disponibles

Screwport
7C
#8 x 5/8"
Flathead
Screw
7A
Strike
Post Lip
Column
Groove
Side
Panel
7. Install the Door Framework
Place the door framework between the side panels.
Align the flange lip and strike post lip with the column grooves as shown in 7A and 7B above.
Push the flange lips and the strike post lip all the way into the column grooves as shown in 7C and
7D above.
Secure the side panels to the framework by threading the #8 x 5/8" flathead screws into the screw
ports of the column.
8. Install the Bushings and Plugs
For right pivot installations: Insert a plug into the right side hole of the top and bottom bridge
members.
For left pivot installations: Insert a plug into the left side hole of the top and bottom bridge
members.
Insert a plug into the opposite hole of the top and bottom bridge members.
1034050-2-E
7D
7B
Flange
Column
Lip
Groove
Side
Panel
Illustration is for
Right Side Pivot
Plug
Plug
8
Bushing
Bridge
Member
Bushing
Bridge
Member
Sterling
Tabla de contenido
loading

Tabla de contenido