Kohler K-669 Guia De Instalacion página 16

Ocultar thumbs Ver también para K-669:
Tabla de contenido
Idiomas disponibles

Idiomas disponibles

Integral
Supply Stop
Hot
Tab
Valve Stem
Adapter Tab
Removal Clip
5. Hot Temperature Adjustment
CAUTION: Risk of product damage. Do not overtighten the
head nut. Excessive torque may damage the head nut.
Turn both integral supply stops outward until they contact the
stop bracket (not shown).
Detach the removal clip from the head nut.
Remove the head nut from the valve casting by turning the head
nut counterclockwise.
Remove the detent collar with the spring from the cartridge.
Remove the valve spline adapter.
NOTE: The spring on the detent collar may fall off. Reattach the
spring around the detent collar if this occurs.
Turn the valve stem fully counterclockwise.
NOTE: Leave the detent collar off while making adjustments.
Reinstall the head nut to the valve casting. Hand tighten the head
nut until the shoulder of the head nut contacts the lip of the
valve casting.
Turn both integral supply stops inward (not shown).
Turn on the water using the volume control valve (not shown).
Allow the water to flow for several minutes to stabilize the water
temperature.
1041158-2-F
Stop Bracket
Integral Supply Stop
Valve Spline
Adapter
Detent Collar
with Spring
Removal
Clip Tab
16
Head Nut
Kohler Co.
Tabla de contenido
loading

Este manual también es adecuado para:

K-679K-670K-680

Tabla de contenido