The dehumidifier must be installed
by a QUALIFIED AND SUITABLY TRAI-
NED TECHNICIAN, in compliance with
the national legislation in force in the
country of destination (Ministerial De-
cree 329/2004).
AERMEC will not assume any responsi-
Danger!
The refrigerant circuit is under pressure.
Moreover, very high temperatures can be
reached. The appliance may only be opened
by an SAT service technician or by a quali-
fied technician.
Work on the cooling circuit may only be
carried out by a qualified refrigeration
technician.
8. 1 .
CHOICE OF PLACE OF
INSTALLATION
Before installing the unit, check the
integrity of the unit on receipt. The
machine leaves the factory in perfect
state. Any damage must be protested
against immediately to the carrier
and noted on the Delivery Sheet
before signing. AERMEC spa must be
informed regarding the entity of the
damage within 8 days. The Customer
must fill in a written report in the case
of relevant damage.
Handle the packaging using suitable
means so as not to damage the
8.2.
INSTALLATION PROCEDURE
1. Creation of a niche
2. Installing pipes and cables
3. Assembly of the installation frame and
the surrounding frame
4. Fixing the dehumidifier
5. Execution of the hydraulic and electrical
connections
6. Assembly of the grille
10
7.
SAFETY PRECAUTIONS AND
REGULATIONS
bility for damage due to failure to follow
these instructions.
Before beginning any operation,
READ THESE INSTRUCTIONS CARE-
FULLY AND CARRY OUT THE SAFETY
CHECKS TO REDUCE ALL RISK OF DAN-
GER TO A MINIMUM. All the personnel
involved must have thorough knowled-
GAS R134a
The dehumidifier comes supplied with a
sufficient quantity of R134a refrigerant
gas. This refrigerant is chlorine-free and
does not damage the ozone layer. R134a
is not flammable. However, all maintenance
operations must be carried out exclusively
by a specialised technician using suitable
protective equipment.
Danger of electrical discharge!
8.
INSTALLATION
dehumidifier such as: automatic lifting
systems, metal trolley with wheels
etc. During unloading and positioning
pay great attention to sudden or
violent manoeuvres in order to protect
internal components. The units can be
lifted manually, paying attention not to
damage the lateral and upper panels
of the DMP. It must always be horizon-
tal during these operations. Prepare
a delimited area, suitable for storage
with flat floor or foundation.
− If the dehumidifier must not be used
immediately, store it in a place protec-
ted from atmospheric agents or other
possible causes of damage. The tempe-
ge of the operations and any dangers
that may arise at the moment in which
the installation operations are carried
out.
Before opening the dehumidifier, complete-
ly disconnect the appliance from the power
mains.
rature and humidity limits stated below
must be respected in the place of sto-
rage:
− Temperature d.b.: -10°C ÷ 50°C
− Relative humidity: 20% ÷ 90%
− The selected place must have enough
space to permit all the necessary tube
positionings.
− IT IS mandatory to foresee to the ne-
cessary technical space in order to
allow ROUTINE AND EXTRAORDINARY
MAINTENANCE interventions.