Chute Control Styles
E-Z Chute™ see page 7.
Chute Handle
Chute
2-Way Chute Rotation Control with Remote
Chute Pitch see page 8.
Chute Rotation
Control
Assembly
Chute
Chute Assembly
E-Z CHUTE™
1. Place the chute handle (a) onto the chute (b) (Figure 6). Be
certain that the handle is aligned in the channel on the chute
and the tabs snap into place.
a
b
Figure 6
2. Remove the hex washer screws (c) in the chute base
(Figure 7).
ASSEMBLY
Upper Chute Rotation
Control see page 8.
Chute
Lower Chute Rotation Control see page 9.
Control Assembly
Chute
Figure 5
c
3. Align the holes in the chute base with the three tabs (d) in the
lower chute (Figure 8, Inset). Secure the chute base with the
a
hex washer screws (a) removed in Step 2 (Figure 8).
a
b
7
Upper Chute Rotation
Control Assembly
Chute Rotation
c
c
Figure 7
Figure 8
d