Hergom H-03/70 C Instrucciones Para Instalación, Uso Y Mantenimiento página 25

Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

Follow these steps to install the insulation:
1. First, place the studs on the nuts provided on
the boiler. Fig.4
2. Insert the different panels onto the studs, as
shown, so that the aluminium foil is the visible
side and the precut parts of the pieces do not
cover the sockets on the boiler. Fig.5
3. Fasten the panels with the washers and M.6
nuts. Fig.6
Note: ensure the right-hand side panel does not
intervene with the correct operation of the flue
system.
1. Screw the studs on the nuts.
2. Insert the insulation on the studs.
FIG. 4
FIG. 5
3. Fasten the panels with a washer and a nut.
FIG. 6
Tabla de contenido
loading

Tabla de contenido