CONSIDERATIONS FOR INSTALLATION
•
The installation and testing operations must be performed solely by qualified personnel in
order to guarantee the proper and safe operation of the automatic gate.
•
The company declines any responsibility for damage caused by incorrect installations due
to incompetence and/or negligence.
•
Before assembling the automatism, check that the gate is in perfect working order, hangs
well on its hinges and is suitably lubricated. It must also comply with the safety standards
in force in the country of installation..
Introductory note: Dig a hole big enough to hold the foundation box, calculate the
required opening angle,
insert the sheath for laying the power cable, make water drainage holes in the
ground and cement the box solidly.
GATE WING OPENING ANGLE
Establish the required opening angle
Internal view
Internal view
INSTALLATION
Pillar
Pillar
Box position
90°
Box position
110°