Electrical Connection And Tests; Checking After Wiring - Bernard Controls AQL Serie Guía De Inicio

Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

5 ELECTRICAL CONNECTION AND TESTS

To perform electrical wiring, please refer to the wiring diagram
supplied and follow the terminals' numbering.
Make sure not to wire AC supply on A, B, C terminals or DC supply
on 1, 2, 3 terminals, that will damage the board.
!

Checking after wiring

Once the actuator wiring is completed, the following points must be
checked:
1. Make sure that power supply voltage matches information on
the sticker on the side of the actuator.
2. Check that all connectors or cable glands are correctly
tightened.
3. Move the valve using manual override to an intermediate
position.
4. Electrically operate opening and closing travels and check that
the actuator rotates in the right direction and stops at the
desired position.
Never use a powered rotary equipment on manual override to
operate the actuator.
If any fault is detected at this stage, please check all wiring.
English
7

Hide quick links:

Tabla de contenido
loading

Este manual también es adecuado para:

Aq1lAq3lAq7

Tabla de contenido