Watts FD-190-PR/190-PR-60 Instrucciones De Instalación página 4

Tabla de contenido
Idiomas disponibles

Idiomas disponibles

2. Drain Body
Attach the drain body securely to the leader pipe. Use the bubble level on top of the
plastic cap to level the drain body evenly before concrete is poured. Check local
code requirements before pressure testing the connection. Plastic drain body
should be solvent welded to the pipe. Cast iron body will be no hub or push
on (specify).
3. Concrete
Concrete floor should be poured flush with the top of the drain body.
Drain Body
Concrete
Concrete
Leader Pipe
4.Waterproofing Membrane
Waterproofing membrane is used per the manufacturers instructions. Clamping
collar must be removed while installing waterproofing membrane. Waterproofing
membrane sits on top of the drain body. Clamp collar attaches to the drain body
clamping the waterproofing membrane between the two. Small grooves in the clamp
collar allow water to flow off the membrane, through the slits and into the drain.
Clamp collar is secured with screws (provided). Screws should be inserted with a
maximum torque of 8 ft-lbs.
Note: Clamp collar inverts for a lower rough-in height.
Clamping Collar
Clamping Collar
Waterproo ng
Waterproo ng
Membrane
Membrane
4
Tabla de contenido
loading

Tabla de contenido