Installation And Operating Instructions; Boiler Room - Lamborghini Caloreclima ERA 31 S Manual De Instalación Y Mantenimiento

Tabla de contenido
Idiomas disponibles

Idiomas disponibles

30

INSTALLATION AND OPERATING INSTRUCTIONS

BOILER ROOM

The boiler, C type, can be installed also in normal dwelling houses, as set forth in the regulations in force (Pr.
D. no. 412/93 and UNI 7129 standard).
It is not necessary to prepare any vent, but the arrangement for a correct air inlet and fume evacuation must be
strictly complied with (Refer to the following page).
CONNECTION TO THE GAS PLANT
The boiler must be connected to the gas plant according to the regulations in force. To determine the piping
diameters, refer to the tables of the UNICIG 7129 standard, considering the boiler output as shown in the
technical data tables (page 9).
CONNECTION TO THE WATER CIRCUIT
The boiler must be connected to the water circuit according to the regulations in force. In case of hard waters
(above 20 French degrees), suitably treated water must be used in the plant. Should it be necessary to use anti-
freeze, observe the percentages suggested by the Manufacturing firms based on minimum temperatures,
perfectly mixing the anti-freeze with the water.
Circulators mounted on ERA 31 are provided with three speeds.
ERA 31 S PK are supplied with the circulator adjusted to the third speed. Generally, such setting should not be
changed.
WATER-SIDE LOAD LOSSES
PRESSURE AVAILABLE AT THE LINKS
(versions without accessories)
(PK versions)
AIR INTAKE AND FUME EVACUATION
The type of installation and terminal position must comply with the provisions of the regulations in force
(PRD no. 412/93 and UNI 7129) and with local regulations, if applicable.
According to what provided by the construction standards of C-type boilers, the piping provided by the
manufacturer must be used, included in the catalogue under ACCESSORIES.
Tabla de contenido
loading

Este manual también es adecuado para:

Era 31 s pk

Tabla de contenido