The instruction manual is to be read and observed prior to commissioning.
After the Klaro set-up kit has been installed, the entire system should be filled with fresh water. Only then
can the system be commissioned.
After the switch cabinet is connected to the mains power (the main switch of metal switch cabinets is to
be switched to position "1"), the control electronics carry out a brief self-test. The cabinet is then ready to
operate and operates the system fully automatically.
The cabinet is then ready for operation and operates the system on a fully automatic basis. After
assembly the system functions should be checked in manual mode, both in the machine cabinet and in
the trench.
In the case of systems with optional comfort control with underload detection (KLPlus), this is to be
calibrated and started up. You will find the instructions for this in the instruction manual.
Important: According to DIN 4261-1 all chambers / tanks must be aerated. Additional ventilation lines or
ventilation openings must be fitted if necessary. The ventilation lines must be arranged such as to allow
natural ventilation (flue effect).
Ventilation with a clear drain
Otto Graf GmbH – Carl-Zeiss-Str. 2-6 – DE-79331 Teningen – Tel.: +49 7641 589-0 – Fax: +49 7641 589-50
GRAF Distribution S.A.R.L – 45, route d´Ernolsheim – FR-67120 Dachstein Gare – Tél.:+33 388 49-7310 – Fax: +33 388 49-3280
GRAF Iberica Tecnología del Plástico S.L. – Marquès Caldes de Montbui, 114 – ES-17003 Girona – Tel.: +34 972 913767 – Fax: +34 972 913766
GRAF UK Ltd – Target House – Thorpe Way Ind. Estate – Banbury – Oxfordshire – UK-OX16 4SP – Tel.: +44 1608 661-500 – Fax: +44 1295 211333
www.graf.info
6.
Commissioning the system
22 / 44
Ventilation with seepage or an obstructed drain
2015-08