®
ABIROB
A
6.3 Attaching the machine-side connector
Fig. 5 Setting up the cable assembly on page EN-12
Check once again whether the wire guide has been fitted correctly.
1 Join the central connector (4) and the central socket at the wire feeder and secure them with
the connection nut (6).
2 Fasten the air-blast hose (5) to the air-blast and injection unit or the air-blast valve. Seal the
connector gas tight if the 'air blast' option is not used.
6.4 Connecting the control lead
Fig. 5 Setting up the cable assembly on page EN-12
The control lead (3) is open on the machine side. The customer must connect a suitable plug. If
all data are provided, the device can also be delivered ready for connection. Otherwise,
choose a compatible plug for your power source and solder it to the corresponding leads
according to the terminal diagram.
a = green, b = white, c = brown, d = yellow (insulated), e = gray (insulated), f = blue (insulated),
g = pink (insulated), h = black, i = purple, j = red (insulated)
Fig. 6
Connecting the control lead
BAL.0125 • 2019-04-15
6 Putting into operation
GN
WH
BN
YE
GY
BU
PK
BK
VT
RD
a
b
c
d
e
f
g
h
i
j
EN - 13