Light Oil Feeding; Priming And Adjustment Of Oil Pump - Ecoflam Multicalor 300.1 Manual Del Usuario

Quemadores mixtos gas + gasoleo
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 44
420010310200 MULTICALOR 300.1-400.1 PR/PR
EN
1 -
Inlet
2 -
Return
3 -
Bleed and pressure gauge port
4 -
Vacuum gauge port
5 -
Pressure adjustment
6 -
Nozzle outlet
7 -
Heater
WARNING: For a correct working of the pump, verify what follows:
Pump :
Oil temperature at the pump:
Maximum allowable pressures:
SUNTEC TA2C4
4
1
5
2
VERIFY:
- That piping system is perfectly sealed;
- That the use of hoses is avoided whenever is possible (use copper pipes preferably);
- That depression is not greater than 0,45 bar, to avoid pump's cavitation;
- That check valve is suitably designed for the duty;
The pump pressure is set at a value of 22-25 bar during the testing of burners. Before starting the burner, bleed the air
in the pump through the gauge port. Fill the piping with light-oil to facilitate the pump priming. Start the burner and
check the pump feeding pressure. In case the pump priming does not take place during the first prepurging, with a con-
sequent, subsequent lock-out of the burner, rearm the burner's lock-out to restart, by pushing the button on the control
box. If, after a successful pump priming, the burner locks-out after the prepurging, due to a fuel pressure drop in the
pump, rearm the burner's lock-out to restart the burner. Do never allow the pump working without oil for more than
three minutes.
Note: before starting the burner, check that the return pipe is open. An eventual obstruction could damage the
pump sealing device.

LIGHT OIL FEEDING

SUNTEC TA...C40105
Max. 140 °C
Max. 5 bar on inlet

PRIMING AND ADJUSTMENT OF OIL PUMP

1 - INLET
3
2 - RETURN
3 - BLEED AND PRESSURE GAUGE PORT
4 - VACUUM GAUGE PORT
6
5 - PRESSURE ADJUSTMENT
6 - TO NOZZLE
22
230V 50Hz
loading

Este manual también es adecuado para:

Multicalor 400.1Multicalor 500.1Multicalor 600.1