Installing Rpa455Xx In Hazardous Area Zone 2; Levelling; Warming Up - Mettler Toledo RPA455 Serie Manual De Instalación

Ocultar thumbs Ver también para RPA455 Serie:
Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

30
MIN
12
Installation
Zone 2

2.5 Installing RPA455xx in Hazardous Area Zone 2

Hazardous Area Zone 2
RPA455xx is designed for use in hazardous area Zone 2. Choose one of the following two
wiring solutions to install RPA455xx.
FM Approved ACPS455xx Cable Power Supply
Zone 2
RJ45 to USB-A
Solution 1: Wiring for power input and RS232 communications
RPA455xx
Hazardous Area Zone 2
FM Approved ACPS455xx Cable Power Supply
RJ45 to USB-A
RPA455xx
Solution 2: Wiring for power input and Ethernet communications through APS455xx
and AC adapter
Hazardous Area Zone 2
Power Cable
RJ45 to RJ45
Hazardous Area Zone 2
RPA455xx
Power Cable
RJ45 to RJ45

2.6 Levelling

The scale should be perfectly horizontal to ensure consistent, reproducible weighing
RPA455xx
results. Relevel the scale each time its location is changed.
Please note that all metrological approved scales are providing a levelling bubble.
➜ Turn the adjustable feet until the level bubble is within the ring marking.

2.7 Warming Up

➜ Warm up the scale for at least 30 minutes after initial connection to the USB Power
and Data Barrier.
▲ Doing so allows the scale to reach the required operating temperature and,
consequently, deliver accurate weighing results.
30542729
|
A
|
10/2019
Safe Area
PC
Safe Area
PC
Safe Area
APS455xx
Power Cable
3
USB-B to USB-A
1
4
Ethernet Cable
(not supplied)
Safe Area
1
2
3
4
APS455xx
Power Cable
3
USB-B to USB-A
1
4
Ethernet Cable
(not supplied)
1
2
3
4
METTLER TOLEDO Installation Manual RPA455x / RPA455xx
AC Adapter
Router
AC Adapter
Router
Tabla de contenido
loading

Tabla de contenido