Environmental Protection; Certificate Of Conformity - Narex ENP 20 E Instrucciones De Uso

Ocultar thumbs Ver también para ENP 20 E:
Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 16
astening the tool head
A complete tool head consists of parts (10, 17, 18, 19) and a com‑
plete mounted matrix (9, 15, 16), and is fastened with a clamp bolt
in the gear part. This bolt (11) is recommended to be replaced for a
new one after multiple screwing in and out (plunge grinding), oth‑
erwise the thread in the gear part (2) may be damaged due to con‑
stant drawup. In threads of new clamp bolt (11) there is a dry drop
of locking glue which prevents the bolt from loosening, once the
bolt (11) is screwed in the gear part (2). After the bolt is repeatedly
(approx. 5times) screwed in and out, the efficiency of the glue de‑
creases, and it is recommended to replace the bolt for a new one.
Clamp bolt (11), together with beam (17) are secondarily fastex‑
pendable parts.
Maintenance and service
ATTENTION! Risk of el. shock. Prior to start any opera-
tion, pull the plug out of the socket!
Vent holes of the motor guard may not be covered.
Cable replacement must be carried out by a specialized service sta‑
tion authorized correspondingly.
100 hours of operation. Any brushes shorter than 5 mm should be
replaced for new ones.
After approx. 100 hours of operation you should exchange the lu‑
brication oil.
ATTENTION! With respect to protection from el. shock
and preservation of the class of protection, all mainte-
nance and service operations requesting jig saw case
removal must be performed by the authorized service centre
only!
The current list of authorized service centres can be found at our
website www.narex.cz, section "Service Centres".
Storage
Packed appliance may be stored in dry, unheated storage place
with temperature not lower than ‑5 °C.
Unpacked appliance should be stored only in dry storage place
with temperature not lower than +5 °C with exclusion of all sudden
temperature changes.

Environmental protection

Power tools, accessories and packaging should be sorted for envi‑
ronmental‑friendly recy.
Only for EU countries:
Do not dispose of power tools into household waste!
According to the European Directive 2002/96/EC on waste electri‑
cal and electronic equipment and its incorporation into national
law, power tools that are no longer suitable for must be separately
collected and sent for recovery in an environmental‑friendly man‑
ner.
Warranty
Our equipment is under warranty for at least 12 months with re‑
gard to material or production faults in accordance with national
legislation. In the EU countries, the warranty period for exclusively
private use is 24 months (an invoice or delivery note is required as
proof of purchase).
Damage resulting from, in particular, normal wear and tear, over‑
loading, improper handling, or caused by the user or other dam‑
age caused by not following the operating instructions, or any
fault acknowledged at the time of purchase, is not covered by the
warranty.
Complaints will only be acknowledged if the equipment has not
been dismantled before being sent back to the suppliers or to an
authorised NAREX customer support workshop. Store the operat‑
ing instructions, safety notes, spare parts list and proof of purchase
in a  safe place. In addition, the manufacturer's current warranty
conditions apply.
Note
Due to continuous research and development work, we reserve
the right to make changes to the technical content of this docu‑
mentation.

Certificate of Conformity

We declare that the device meets requirements of the following
standards and directives.
Safety:
EN 60745‑1; EN 60745‑2‑8
Directive 2006/42/EC
Electromagnetic compatibility:
EN 55014‑1; EN 55014‑2; EN 61000‑3‑2;EN 61000‑3‑3
Directive 2014/30/EU
RoHS:
Directive 2011/65/EU
Place of storage of the technical documentation:
Narex s.r.o., Chelčického 1932, 470 01 Česká Lípa, Czech Republic
Narex s.r.o.
Chelčického 1932
470 01  Česká Lípa
English
Antonín Pomeisl
CEO of the company
15

Capítulos

Tabla de contenido
loading

Tabla de contenido