Operating The Three-Stage Permanently Attached Iv Pole - Stryker Birthing Bed Manual De Instrucciones

Tabla de contenido
Idiomas disponibles

Idiomas disponibles

Operating the three-stage permanently attached IV pole

CAUTION
Do not hang IV bags that exceed 40 lb onto the IV pole.
Always make sure that the IV pole is at a low height to allow it to pass safely through door openings.
Do not use the IV pole as a push/pull device.
Note: You can only install the three-stage permanently attached IV pole at the head end of the product.
To use the three-stage permanently attached IV pole:
1.
Lift and pivot the pole from the storage position.
2.
To raise the height of the pole, pull up on the telescoping portion (A) until it locks into place at its fully raised position
(Figure 1-55 on page
1-33).
3.
For a higher IV pole, pull up on section (B)
and it will lock into place.
4.
Rotate the IV hangers (C) to the desired position and hang the IV bags
5.
To lower the IV pole, push up on the black portion of the grip (D) while holding on to section (B) until it lowers
1-55 on page
1-33).
6.
Turn the latch (E) until the telescoping portion (A) lowers
www.stryker.com
Operation
(Figure 1-55 on page
Figure 1-55: Three-Stage Permanently Attached IV Pole
4701-209-0 01 REV A
1-33). Release section (B) at any desired height
(Figure 1-55 on page
(Figure 1-55 on page
1-33).
C
B
D
A
E
1-33).
(Figure
1-33
English
EN
Tabla de contenido
loading

Este manual también es adecuado para:

4701Birthingbed

Tabla de contenido