Friedrich Q Chassis Serie Manual De Instalación Y Funcionamiento página 29

Tabla de contenido
Idiomas disponibles

Idiomas disponibles

Figure 24
3/4" MINIMUM
CABINET FRONT
1" THICK LUMBER
1" MINIMUM
INSIDE WALL
EXTERIOR WALL
STEP 7.
Cut two pieces of standard 1" lumber (supplied by installer)
to the length and width required. Place in front and back of
bottom sill channel as shown in Figure 24. Secure with nails
(supplied by installer).
STEP 8.
Seal all holes in the cabinet with caulking compound (supplied
by installer).
Figure 25
SOLID MASONRY CONSTRUCTION
NOTE: ELECTRICAL RECEPTACLE LOCATION
FROM POINT "X" MUST BE WITHIN A MAXIMUM
RADIUS OF 69" FOR 115V UNITS.
FRONT EDGE OF LOUVERS
MUST ALWAYS BE OUTSIDE OF
EXTERIOR WALL SURFACE.
1/4" SLOPE DOWN.
POSITION AND SECURE
CABINET DOWNWARD.
SLOPE OUTSIDE FOR
DRAINAGE.
MAX. WALL
THICKNESS
ALLOWED 8-1/2"
CABINET
MORTAR
3/4" MINIMUM FRONT
EDGE OF CABINET TO
INSIDE WALL SURFACE.
7/8" SLOTTED HEAD SCREWS (3 EA. SIDE)
NAILS MAY BE USED IF DESIRED.
STEP 9.
Complete the installation by following STEPS 6 through 11 of
Standard Window Installation (Page 24). Window Seal Gasket
mentioned in STEP 9 will not be required.
IMPORTANT: Before operating your unit, read STEP 11 of Standard
Window Instructions.
CAULK ALL SIDES
POINT "X"
TRIM AROUND THE
CABINET WITH A
SUITABLE WOOD
MOULDING AND
FINISH TO SUIT.
CAULK ALL AROUND
CABINET ON OUTSIDE
TO INSURE A WEATHER
TIGHT SEAL.
ELECTRICAL
RECEPTACLE
FRR092
FRR093
29
Tabla de contenido
loading

Este manual también es adecuado para:

Sq05Sq06Sq08Sq10Eq08

Tabla de contenido