z If a device is mounted fl ush with the wall, guide it into the housing by
applying even, slight pressure on the left and right (Figure 13) until the
>>
Push-to-open
When pushing in the touch display into the housing, make sure that the
P
connected cables do not get wedged in.
z Remove the protective foil from the user interface.
z Switch on auxiliary voltage.
The device charges the operating system/Launcher and displays the
desktop interface/home page of the Launcher after a few seconds. Device is
ready for operation.
Figure 13 a/b: Flush wall mounting installation in the fl ush-mounted housing
(23) Flush-mounted housing, fl ush-to-wall (not within scope of delivery)
<<
lock of the housing engages.
z
(22)
(23)
(22)
23