5. INSTALLATION PROCEDURE
Thank you for installing this charge point.
Make sure there is enough space to properly do the work.
Ensure to work safely and take the safety of others into
consideration as well, always work according local
safety regulations.
When selecting the mounting location of the charge point,
ensure that future maintenance work can be done easily.
5.1 PREPARATION
Step 1; Prepare the cabling & RCD and MCB (conform to
local rules & regulations);
Step 2; Indicate which circuit(s) the charge point is
connected to the distribution board;
Step 3; Attach the appropriate stickers provided
(1-phase or 3-phase) to the sides of the charge point in
the designated indent spaces;
Step 4; Turn the socket lid or dummy socket anti-clockwise
and out of the cover of the charge point;
Step 5; Then pull the cover from the rear edge to open the
charge point. Do not use any objects or tools to do this;
5.2 MECHANICAL MOUNT
For standard wall mount proceed with 5.2a, for optional
pole mount on pavement proceed with 5.2b, for optional
pole mount in soil proceed with 5.2c;
5.2A MECHANICAL MOUNT (WALL)
Step 1; Attach the wall bracket at the desired height
(+/- 1 m height) on the wall;
Step 2; Put the charge point on the wall bracket to
check its placement. On the wall, mark the positioning
of the bottom two attachment points of the charge point
and select the appropriate fixtures (plugs, screws and
washers).
Step 3; Secure the charge point to the wall bracket using
the two M8 x 12 mm bolts and washers provided.
Step 4; Secure the charge point to the wall using the
bottom two attachment points. Ensure that the grey
spacers are placed on the back of the charge point at
the bottom two attachment points.
INSTRUCTION MANUAL – P14
5.2B MECHANICAL MOUNT (POLE ON
PAVEMENT)
Step 1; Drill holes into the pavement for the wedge bolts
or chemical anchors (not provided);
Step 2; Route the power cable(s) and UTP cable(s)
through the pole;
Step 3; Mount the wedge bolts or chemical anchor into
the pavement;
Step 4; Mount the pole to the threaded ends with
washers and nuts (not provided);
Step 5; Mount the green/yellow pole earthing wire to the
terminal block earthing connection;
Step 6; Secure the charge point to the pole bracket
using the four M8 x 12mm bolts and washers provided,
making sure to connect the pole earthing wire to the
bottom right bolt;
5.2C MECHANICAL MOUNT (POLE IN SOIL WITH
CONCRETE BASE)
Step 1; Dig the concrete base into the soil, make sure it
is steady and level;
Step 2; Route the power cable(s) and UTP cable(s)
through the pole;
Step 3; Mount the pole to the concrete base with the 4
bolts M8 x 35 and washers that are provided;
Step 4; Mount the green/yellow pole earthing wire to the
terminal block earthing connection;
Step 5; Secure the charge point to the pole bracket
using the four M8 x 12mm bolts and washers provided,
making sure to connect the pole earthing wire to the
bottom right bolt;
5.3 POWER CONNECTION
Step 1; Select the appropriate grommet(s) that suits
the cable(s) thickness and place it in the opening of the
power cable inlet. Moisten if necessary to make it easier
to feed the power cable through;
Step 2; Secure the power cable(s) using the cable
clamp(s);
Step 3; Mount the (closed) black grommet in the
remaining cable inlet to make the charge point watertight
(not applicable for tethered cable versions);
Step 4; Connect the power to the terminal blocks, like
indicated in the 'overview of connections' section;
0506NM20INT02