Tabla de contenido
Idiomas disponibles

Idiomas disponibles

3. Installation and Wiring

3.5 UPS Installation

There are two installation methods. One is with the balance supports and the other is without the balance supports.
Installation without the Balance Supports
After moving the UPS to its final installation area, use the levelers to stabilize the UPS cabinet on the ground.
Installation with the Balance Supports
To reinstall balance supports removed from the UPS during the unpacking process, follow these steps:
1
Once the installation area has been selected, follow the mounting hole diagram below to drill holes.
Mounting Hole
(Diameter:ø12 mm)8 pcs.
(Figure 3-1: Stabilize the UPS with Levelers)
(Front)
(Back)
22.1 in.
(561.6 mm)
24.5 in.
(621.6 mm)
(Figure 3-2: Mounting Hole Diagram)
8
Mounting Hole
(Diameter:ø6.5 mm)8 pcs
Tabla de contenido

Solución de problemas

loading

Tabla de contenido