ЗАО "Берг АБ"
(495) 727-22-72
3. Installation of mains plug
A qualified electrician must install a suitable mains plug. The correct supply voltage is
shown in the designations in section 2.2.
The wires should be connected as follows:
TIH Lxx/MV, TIH Lxx/LV with 200V-3 phases, and all other three phases supply
execution
Colour of TIH Lxx/MV wire
yellow / green
blue
brown
Connect the TIH L to only two of the three phases.
TIH Lxx/LV with single phase supply
Colour of TIH Lxx/LV
yellow / green
blue
brown
4. Preparation for use
• Place the TIH L in the horizontal position on a stable surface.
• Assemble the bearing support with the supplied bolts.
• Connect the mains plug to a suitable mains supply.
• Plug the remote control into the connector on the heater electrical cabinet.
• Slide the sliding yoke in open position. See the illustrations at the beginning of this
manual.
• For workpieces heated over the sliding yoke, follow these steps:
- Lift the workpiece over the heater operating area using appropriate lifting
equipment.
- Slide the yoke through the workpiece bore diameter.
- Close the sliding yoke so that it completely covers the top of both vertical supports
• For workpieces heated around the induction coil, follow these steps:
- Place the workpiece over the induction coil using appropriate lifting equipment.
- For best performance, adjust the position of the workpiece so that the induction coil
is in the centre.
- Close the sliding yoke so that it completely covers the top of both vertical supports.
• If you will use TEMP MODE, plug the temperature probe into its socket on the heater
electrical cabinet. Place the magnetic end of the probe on the inner ring of the bearing
or on the innermost surface of the workpiece.
• Switch on the TIH L with the main switch of the heater electrical cabinet
• Observe the self-test of the remote control display and signal tone.
SKF TIH L
Mains supply terminal
ground
phase 1
phase 2
Mains supply terminal
ground
neutral
phase 1
www.promshop.biz
9