SinePower
4: 12-day conditioning
Every 12 days, the battery charger switches back to phase 3 for 85 min in order to
revive the battery. This prevents any fatigue symptoms such as sulphation.
8
Fitting the device
8.1
Tools required
For the electrical connection you will need the following tools:
• DC connection: two flexible connection cables
Determine the necessary thickness from the table in chapter "Fitting the device"
on page 15.
• AC connection: two 3-phase cables (input and output)
• Housing ground: one cable
• Crimping tool
• Cable lugs and conductor sleeves
For fastening you will require the following tools:
• Machine bolts (M4) with washers and self-locking nuts or
• self-tapping screws or wood screws.
8.2
Mounting instructions
When selecting the installation location, observe the following instructions:
• The device can be mounted horizontally or vertically.
• The device must be installed in a place that is protected from moisture.
• The device may not be installed in the presence of flammable materials.
• The device may not be installed in a dusty environment.
• The place of installation must be well ventilated. A ventilation system must be
available for installations in small, enclosed spaces. The minimum clearance
around the device must be at least 5 cm (fig. 4).
• The air intake on the underside or the air outlet on the back of the device must
remain clear.
EN
Fitting the device
15