Installation; Wall Mounting; Electrical Connections; Power Supply - Aqua Technopool3 Manual De Instrucciones

Tabla de contenido
Idiomas disponibles

Idiomas disponibles

TECHNOPOOL3
Dosing systems for swimming pools

2.0 INSTALLATION

In vertical position with an uncertainty not higher than +/-15°.
Away from heat sources and in a dry place, with room temperature ranging between 0°C and 45°C.
In a ventilated place and easily accessible to an operator for ordinary maintenance.
At maximum 1.5 m high from the liquid to be dosed.
Do not install the system above the chemical tank if it emits smoke, unless the container is not hermetically
closed.
2.1
W
ALL MOUNTING
Place the system on a wall close to the dosing section and follow the instructions described below.
2.2
E
LECTRICAL CONNECTIONS
Before proceeding with the installation, ensure the presence of a suitable earthing connection and of an
appropriate sensitive differential switch. Observe electrical values indicated on the system label.
ATTENTION: Before carrying out maintenance on the system, always disconnect the power supply.
Always check all electrical connections, by using a multimeter. An incorrect voltage may damage the
system not covered by the guarantee. The following manual must always be kept as reference for
any electrical connection.
All electrical connections must be carried out in compliance with local laws regarding electrical
systems.
CAUTION !!!!!
Verify that the earth system is perfectly functional and complies with the applicable regulations.
Make sure that the highly sensitive differential switch is present (0.03 A). Verify that the rated
values of the pump are compatible with those of the mains. Never install the pump directly in
parallel with inductive loads (e.g. motors/solenoid valves) if necessary, use an isolating relay.
There are 2 protection devices inside the pump: a varistor and a fuse.
2.2.1 Main power supply
Connect a voltage between 100 and 240VCA - 50/60Hz on clamp
2.2.2 Temperature probe
Connection of the temperature probe PT100 to the corresponding clamp; depending on the probe model available,
carry out one of the connections described below:
2.2.3 Flow signal
Connect the flow sensor signal on input PROX.

2.2.4 Dosing enabling signal (V1)

Connect the enablement signal to the dosing (20-230VAC) on input CHARGE.
2.2.5 P1 pump product level probe
Connect the level probe (on/off contact, without voltage) to input LEVEL DET.
2.2.6 pH pump product level probe
Connect the level probe (on/off contact, without voltage) to input LEVEL RIN.
2.2.7 P2/Rx/Cl/HP pump product level probe
Connect the level probe (on/off contact, without voltage) to input LEVEL SAN.
ADSP7000570
rev. 1.6
.
09/01/2014
INSTALLATION
ENGLISH
38/136
Tabla de contenido
loading

Tabla de contenido