IND560xx Terminal Division 2 and Zone 2/22 Installation Manual
Harsh Enclosure Front Cover
To maintain the proper sealing of the enclosure, it is extremely important that the
front cover on the IND560xx harsh enclosure be centered on the rear housing
when the cover is snapped into place. Refer to Figure 2-6.
Equal
space on
both
sides.
Harsh Enclosure IDNet Bracket
Note that for harsh enclosures that include an IDNet scale interface, a bracket
(included with unit) must be installed to protect the connector from a direct impact.
This bracket must remain intact to properly protect the IDNet connector and
maintain the ATEX approval. Refer to Figure 2-7 for an example of the IDNet
bracket installed on an ATEX certified IND560xx.
2-10
Figure 2-5: Panel Stiffener Bracket Installed
Figure 2-6 : Centering Front Cover on Rear Housing
Panel
stiffener
Mounting
clamps
Equal
space on
both
sides.