Electrical and Fuel Inlet Locations

A through-slab power cable stub-up is preferred. If stub-
up's are not used, (B) indicates the recommended location
for punching holes for attaching power conduit. The 1 inch
N.P.T. fuel inlet connector (A) is shown for reference.
B

Lifting the Generator

WARNING Hazardous Voltage - Contact with power
• If lifting or hoisting equipment is used, DO NOT contact
any power lines.
• DO NOT lift or move generator without assistance.
• Use lifting pipes as described in Lifting the Generator.
• DO NOT lift unit by roof as damage to generator
A
will occur.
The generator weighs approximately 1569 pounds (682 kg).
Proper tools, equipment and qualified personnel should be
used in all phases of handling and moving the generator.
Remove circuit breaker box bottom plate prior to positioning
generator. Two 60" (1.5m) lengths of 2" Schedule 40 pipe (C),
supplied by the installer, are required to lift the generator onto
cement pad. Insert pipes through the lifting holes (D) located
near the unit's base. Use a spreader bar to ensure that the
chains, straps or cables DO NOT touch the generator's roof.
Retouch any chipped paint with supplied touch-up paint.
D
lines could cause electric shock or burns,
resulting in death or serious injury.
Lifting Hazard / Heavy Object - Could result
in serious injury.
C
15