Packing List; Important Notice - Davey EcoSalt Serie Manual De Instalación Y De Mantenimiento

Sistema de sal para piscinas
Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 93

PACKING LIST

Included with your EcoSalt system are the following items, please check the contents
carefully prior to installing the system:
1. Power Supply
2. Electrolytic Cell
3. 2 x Barrel Union Sets
4. Flow Switch
5. Blanking Cap Assembly
6. Earthing System Assembly
7. Mounting kit and spare fuse
Please note product specifications are subject to change without notice. Please consult
your EcoSalt dealer if you have any queries regarding the above.
IMPORTANT NOTICE: A means of full disconnection must be incorporated into the
fixed wiring in accordance to local wiring rules.
INSTALLATION INSTRUCTIONS FOR ECO-SALT
INSTALLING THE POWER SUPPLY:
Select a convenient well-ventilated location within one metre of filter equipment and
mount the Power Supply vertically onto a post or wall 1.5 metres above ground level.
The Power Supply should not be located within 3 meters of the pool water.
Connect Power Supply into a suitable weatherproof outlet or an independant
control box. The Unit must be kept away from acid and other chemical storage areas.
Acid and chemical vapours will corrode the electronics inside the Unit. It must also be
kept away from heat sources. Good ventilation is necessary for correct operation (See
installation diagram on page 18).
Two self-tapping screws and wall plugs have been provided for fast and simple
installation. Use a 7mm masonry drill bit when fitting Power Supply to a brick or concrete
wall. When mounting to a post drill pilot holes and fit screws provided. Once screws are
in position simply hang chlorinator via bracket on back of
Unit.
Page 5 of 18
P/N 403185
Tabla de contenido
loading

Este manual también es adecuado para:

Ecosalt des13ceEcosalt des20ceEcosalt des26ce

Tabla de contenido