Purging Procedures, Leak Test, And Test Run - Mitsubishi Electric MXZ-2F33VF2 Manual De Instalación

Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 43

4. PURGING PROCEDURES, LEAK TEST, AND TEST RUN

4-1. PURGING PROCEDURES AND LEAK TEST
1) Remove service port cap of stop valve on the side of the outdoor
unit gas pipe. (The stop valves are fully closed and covered in caps
in their initial state.)
2) Connect gauge manifold valve and vacuum pump to service port of
stop valve on the gas pipe side of the outdoor unit.
3) Run the vacuum pump. (Vacuumize for more than 15 minutes.)
4) Check the vacuum with gauge manifold valve, then close gauge
manifold valve, and stop the vacuum pump.
5) Leave as it is for one or two minutes. Make sure the pointer of gauge
manifold valve remains in the same position. Confirm that pressure
gauge shows -0.101 MPa [Gauge] (-760 mmHg).
6) Remove gauge manifold valve quickly from service port of stop valve.
7) Fully open all stop valves on the gas pipe and the liquid pipe. Oper-
ating without fully opening lowers the performance and this causes
trouble.
8) Refer to 1-2., and charge the prescribed amount of refrigerant if
needed. Be sure to charge slowly with liquid refrigerant.
9) Tighten cap of service port to obtain the initial status.
10) Leak test
WARNING
To avoid risk of fire, make sure that there are no flammable
hazards or ignition risks before opening the stop valves.
4-2. GAS CHARGE
Perform gas charge to unit.
1) Connect gas cylinder to the service port of stop valve.
2) Perform air purge of the pipe (or hose) coming from refrigerant gas cylinder.
3) Replenish specified amount of the refrigerant, while operating the air
conditioner for cooling.
Note:
In case of adding refrigerant, comply with the quantity specified for the
refrigerating cycle.
CAUTION:
When charging the refrigerant system with additional refrigerant, be sure
to use liquid refrigerant. Charge the liquid refrigerant slowly, otherwise the
compressor will be locked.
To maintain the high pressure of the gas cylinder, warm the gas cylinder
with warm water (under 40°C) during cold season. But never use naked fire
or steam.
Make sure to indicate the followings with ineffaceable ink on the designated
label / spec label.
(1) Precharged refrigerant amount – see spec label
(2) On site additionally charged amount
(3) Total refrigerant amount (1)+(2)
(4) (5) (6) CO
equivalent
2
*1. This information is based on Regulation (EU) No.517/2014.
*2. According to IPCC 3rd edition, GWP is defined as 550.
*4 to 5 turns
*Close
*Open
Hexagonal wrench
Service
port
Control
valve
Open
Close
A
Body
<R32>
Make sure to replace the
cap after the operation.
Indoor
unit
Indoor
unit
Refrigerant gas
cylinder operating
valve
(for R32, R410A)
(kg)
(t)
1
2
(1)
(4)
(4) = (1) × 675/1000
1
(5) = (2) × 675/1000
(2)
(5)
2
(6) = (3) × 675/1000
(3)
(6)
3
Stop valve
Compound pressure
–0.101 MPa
for GAS
gauge (for R32, R410A)
(–760 mmHg)
Stop valve cap
(Torque 19.6 to
29.4 N•m, 200
to 300 kgf•cm)
Handle
Low
Stop valve
for LIQUID
Vacuum pump
Service port cap
(for R32, R410A)
(Torque 13.7 to 17.7
N•m, 140 to 180 kgf•cm)
Precautions when using
the control valve
Charge hose
(for R32, R410A)
When attaching the control valve
to the service port, valve core
may deform or loosen if excess
pressure is applied. This may
cause gas leak.
When attaching the control valve to
the service port, make sure that the
valve core is in closed position, and
then tighten part A. Do not tighten
part A or turn the body when valve
core is in open position.
Union
Stop valve
Liquid pipe
Gas pipe
Union
Liquid pipe
Gas pipe
Service port
Gauge manifold
valve (for R32,
R410A)
Charge hose (for R32,
R410A)
Refrigerant gas cylinder for
R32, R410A with siphon
Refrigerant (liquid)
Electronic scale for
refrigerant charging
Contains fluorinated
greenhouse gases
1 Factory charge
(Refer to SPEC LABEL)
2 Additional charge
3 Total charge (1+2)
Weight
1
CO
equivalent
2
2
(
×GWP/1000)
1
R32 (GWP: 675)
(kg)
1
1
2
3
Pressure gauge
(for R32, R410A)
Gauge manifold
valve (for R32,
R410A)
Handle High
Charge hose (for
R32, R410A)
Outdoor
unit
(t)
2
F-Gas Label
En-9

Hide quick links:

Capítulos

Tabla de contenido
loading

Este manual también es adecuado para:

Mxz-2f42vf2Mxz-2f53vfh2Mxz-2f53vf2

Tabla de contenido