Pfister Avalon R89 Serie Guía De Instalación Rápida página 3

Ocultar thumbs Ver también para Avalon R89 Serie:
Tabla de contenido
Idiomas disponibles

Idiomas disponibles

7
7A
7G
7D
7C
7E
Position Flange (7A) on Valve (7B) with Drain Hole (7C) at the bottom. Place
Protective Washer (7D) on the short end of the reversible Retainer Sleeve (7E).
Screw Retainer Sleeve (7E) onto threaded section of the Stem and Bonnet (7G).
Tighten Retainer Sleeve (7E) by hand until Flange (7A) is snug to finished wall
surface. If the short end of the Retainer Sleeve (7E) is too short, reverse it to
use the longer end.
8 HANDLE ATTACHMENT
8
8A
8D
8C
8E
Screw Stem Extender (8A) onto the Valve Stem (8B). Thread the Set Screw (8C)
into the Handle (8D) and thread it in only three to four turns. Place Handle (8D)
onto the Stem Extender (8A) and tighten the Set Screw (8C) by using the Hex
Wrench (8E) that is provided.
Make sure Set Screw (8C) is securely tightened to handle (8D).
9 SHOWER ARM INSTALLATION
7B
7C
8B
ENGLISH
9
9B
Insert the end of Shower Arm (9A) through the Shower Flange (9B). Apply PTFE
plumber's tape to both ends of Shower Arm (9A) according to manufacturer's
instructions. Screw the end of Shower Arm (9A) into pipe elbow inside the wall.
Slide Shower Flange (9B) tight to the wall.
10 SPOUT INSTALLATION
10
10B
10C
Apply PTFE plumbers tape on both ends of Pipe Niple (10A) (not included).
Screw Pipe Niple (10A) into the elbow inside the wall and tighten with pipe
wrench. The Pipe Niple (10A) is to project 3
Screw Tub Spout (10B) onto Pipe Niple (10A) and tighten until Spout is properly
positioned and flush to the finished wall.
11 UNIT START UP
11
Turn on hot and cold water supplies, and check all connections for leaks.
12 VALVE FUNCTION
3
9A
10A
7
3
7
/
" to 4" from the finished wall.
8
/ 8 " to 4 "
Tabla de contenido
loading

Este manual también es adecuado para:

Avalon g89 serieAvalon 808 serie

Tabla de contenido